The purpose of this study was to understand the spatial variability of climate
change impact in Blue Nile Basin based on hypothetical climate change
scenario and using HBV hydrological model. ...
The subject of changing or fluctuating climate is one of the central issues facing the atmospheric
sciences community. The most profound effect of such climatic changes may be major
alterations ...
The purpose of this study was to estimate the major components of the
hydrologic cycle of Meki River basin using physically based hydrologic water
balance simulation model WaSiM-ETH. The model ...
ainfall based flood estimation techniques are common in hydrologic practice. The currently used
methods are based on the design event approach; they use a probabilistic rainfall depth in combination ...
The project area, Mojo Catchment, is located 40k.m southeast of Addis Ababa in
Oromiya Regional State. Its geographical location is between 38°49' and 39°17'
longitude and 8°25'and 9°05' ...
This paper describes the development and validation of grid-based regional prediction equations
of a conceptual monthly water balance model parameters. The purpose of the research is
generally ...
For the past few decades, land use and land cover changes occur highly in Awassa catchment
due to urbanization, expansion of agricultural land and deforestation. Urbanization effect is one
of ...
Daniel Agegnehu ]"eftrl(Arba Minch, Ethiopia, 2009-09)
Catchment modeling has been an outstanding science for investigation of the hydrological
response of watershed. Different researchers found out that SWAT can efficiently
simulate the hydrology of ...
Currently Butaji ra town is inside the zone of critical water shortage . Besides the town
water supply enterpri se is not in a position to cover the capital and operati on and
maintenance ...
This study focused mainly on river training and water utilization option in
Derek Wuha Catchment of North Wolo zone of Amhara National Regional
State. In the study, a GIS based semi-distributed ...
I My sincere appreciation goes to the Nile Basin Initiative who supported
owe this achievement of mine to the Almighty Godme morally and financially through the time of my study.
From his input to this work and his ...
Runoff estimation from a catchment is a vital phase in water resource planning and
management. Rainfall plays the major role in computing runoff from a catchment
along with other catchment ...
To determine the optimal operation policy and management of reservoir systems, accurate
forecast of the inflows to the reservoir are very crucial. Therefore, the aim of this research
is to ...
Considering the vast untapped hydropower potential of the country, this study envisages the
Potential Assessment of Micro to Small Hydropower in Baro-Akobo River Basin.
In this study spatial variation ...
The main objective of the research was to reconstruct flow regimes of Borkena
catchment in ungauged locations for irrigation development using rainfall-runoff
modeling. Four black-box-type ...
The objective of the study is to understand the rainfall variation in space and
time in the study area and analyze drought characteristics: intensity, duration,
frequency, severity. In this ...
Probable maximum Flood (PMF) is generally viewed as the flood resulting from a PMP ,
plus snowmelt where appropriate, applied to assumed antecedent basin conditions . It is
j the flood that ...
ater Resources in Rwanda is not uniformly distributed as a result of climate variability and
rugged relief. The uneven distribution of the water resource in Rwanda is also exacerbated by
serious ...
This study focused mainly on application of a GIS based semi-distributed
watershed model (HEC-HMS) for estimation of peak discharges and run off
hydrographs. The Digital Elevation Model (DEM) ...
DENG SANTINO ATER AKOT(ARBA MINCH UNIVERSIT, 2010-10)
Sudd swamp area is the largest wetland in Africa, which is located in the central part or south
Sudan. As results of the huge waters losses over Sudd swamp region due to evaporation. Beside ...