Abstract:
This research study on sequencing problem with the introduction of equivalent job for job
block in special class of n-jobs on 3-machines sequencing problem in which some conditions are
imposed on the processing times. The purpose of this research is to find the processing time of
equivalent job for jobs in block, determine optimal value of processing time multiple, due-date
assignment and optimal sequence of jobs so as to minimize squared value of lateness cost func
tion. A heuristic method has been developed based on lemma,theorem and corollary proved for
minimization of objective function. Here the squared value of lateness is used as performance
measure in obtaining optimal sequence. The result of study is a formula to find the processing
time of an equivalent job for jobs in block on each machine has been obtained, the processing
time multiple shown to be constant and independent of the sequence of jobs,due-date assigned
and optimal sequence is obtained by arranging jobs based on the processing time of the last
machine according to shortest processing time rule. Moreover an algorithm has been developed
and numerical example is provided to support the theoretical development.